Current Location:HOME > News > Company news
Do a good job in business, promote production and operation, and complete the an
Release Time:2022-11-23 14:25:32| Browse Times:

How to develop renewable resources enterprises in 2022  Zaige Group recognizes the situation and scientifically formulates the annual production task objectives according to the needs of domestic steelmaking enterprises and the situation of scrap recovery.


The production progress of scrap steel business is related to the overall situation. In order to implement the goal, the comrades found countermeasures to solve the problem, stabilized growth to promote development, and worked together to propose innovative development, cultivate and expand the market, speed up the improvement of functional facilities, and ensure that production funds are in place. At the same time, the construction of infrastructure was strengthened, laying a good foundation for the completion of the target task of scrap recycling, processing and sales.


After the scrap is processed, a new steelmaking charge is formed. The recovered scrap iron and steel is continuously crushed through the crushing production line to remove the coating impurities, so that the light and thin materials of scrap iron and steel can be broken into small pellets, increasing the volume specific gravity, increasing the dissolution rate, increasing the density, reducing the volume, facilitating transportation, turning waste into treasure, protecting the environment, improving the quality of steel, and the supply of products is short of demand.

Adapt to the market situation, formulate a feasible scrap recycling policy, and the vehicles sending scrap steel wait in line for weighing.

Scrap steel recycling resource products waiting for loading. Through the ability of comrades, the scrap business completed the target task in the second half of the year 40 days ahead of schedule.